SRX-SL Headset Charger Wall-mount
A DIN rail must be installed on a wall in a suitable location. Honeywell offers a DIN rail suitable for mounting a single charger, but customers may choose to purchase rails from other suppliers as long as the rails meet Honeywell specifications. Consider the following before mounting your charger to a wall.
- Customer assembly is required for the rail wall mount.
- The customer assumes all responsibility for the installation of the charger units.
- The installer must verify that the installation meets all local building codes.
- Avoid all potential hazards (electrical wires, waterlines, and similar building components) when drilling into the wall.
- Avoid blocking power outlets and other wall receptacles when installing the rail and charger.
- Anchoring a wall mount rail to a wall stud generally results in a more stable installation. If you drill into a wall stud, do not use a screw anchor in that hole.
- If you are mounting chargers side by side, it may be necessary to install the dock assemblies with the headband rests first. The charger assemblies can slide in and out of the dock assemblies after the dock assemblies are secured to the DIN rail. It is recommended that the dock assemblies are spaced a minimum of 1.5 in. (3.81) apart (measured from wall mount levers). This ensures that the charger assemblies do not interfere with each other.
- To allow for proper attachment, seating, and removal of the charger unit the rails must be anchored to the wall at least 16 in. (40.6 cm) from the floor with the product not exceeding 6.5 ft. (200 cm.) from the floor.
- If you are mounting a charger directly above another charger, Honeywell recommends clearance of at least 18 in. (45.7 cm) between DIN rails with the product not exceeding 6.5 ft. (200 cm.) from the floor.